All set for second San Juanico bridge
P9.17-BILLION PROJECT

All set for second San Juanico bridge

/ 04:35 AM July 23, 2024

All set for second San Juanico bridge

ICONIC SPAN San Juanico Bridge, shown in this March 2023 photo, is an iconic 2.1-kilometer span connecting the islands of Leyte and Samar across the San Juanico Strait. —Patrick Roque/contributor

TACLOBAN CITY, LEYTE, Philippines — The proposed second San Juanico Bridge connecting the islands of Leyte and Samar is expected to start civil works within the term of President Ferdinand Marcos Jr.

Edgar Tabacon, Department of Public Works and Highways (DPWH) Eastern Visayas director, however, said the bridge’s completion could extend to the next administration.

Article continues after this advertisement

“We want this San Juanico Bridge II to be completed during the term of President Marcos, but considering the long process it would take, we expect a spillover into the next administration,” he said in an interview.

FEATURED STORIES

READ: DPWH says 2nd San Juanico Bridge to be located in Tacloban

Tabacon said the national government would need additional funds from a foreign firm given the substantial funding required for the project.

Article continues after this advertisement

The DPWH previously reported that at least P9.17 billion would be needed for the proposed San Juanico Bridge II project, which would be built parallel to the existing 2.1-kilometer San Juanico Bridge.

Article continues after this advertisement

The feasibility study for the project is being conducted by the Japan International Cooperation Agency (Jica).

Article continues after this advertisement

The study includes considerations such as the number of lanes, traffic operations, options for the second bridge and the rehabilitation of the existing San Juanico Bridge.

Tabacon said it is likely that Japanese technology would be used in the construction of the proposed San Juanico Bridge II given Jica’s involvement in the feasibility study.

Article continues after this advertisement

Landmark

San Juanico Bridge, constructed in 1969 and completed in 1972 during the administration of former President Ferdinand Marcos Sr., the father of the incumbent President, links Tacloban City in Leyte province to Sta. Rita town in Samar province.

It was inaugurated on July 2, 1973, in time for the birthday of former first lady Imelda Marcos, who is from Leyte.

It is a major landmark, a tourist attraction in Eastern Visayas, and considered the country’s longest bridge until the 8.9-km Cebu-Cordova Link Expressway in Cebu was completed in 2021.

The second bridge was initially planned to be built from Leyte’s Babatngon town to Sta. Rita in Samar but planners decided on a parallel bridge instead since Tacloban is the region’s regional center.

According to Tabacon, a parallel second bridge is more practical since building a Babatngon-Sta. Rita span will make the bridge longer.

“The shorter the distance, the lower the cost,” Tabacon said.

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our daily newsletter

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

A second San Juanico Bridge is meant to address future traffic congestion as the economy of the region grows, officials said.

TAGS: DPWH, Leyte, Samar, second San Juanico bridge

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our newsletter!

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

© Copyright 1997-2024 INQUIRER.net | All Rights Reserved

This is an information message

We use cookies to enhance your experience. By continuing, you agree to our use of cookies. Learn more here.