Miaa to do electrical maintenance work at Naia from Feb. 6 to March 7

PHOTO: Passengers wait for information about their flights at Terminal 3 of Ninoy Aquino International Airport in Pasay City in January 2023. STORY: Miaa to hold electrical maintenance repairs at Naia from Feb. 6 to March 7

Passengers wait for information about their flights at Terminal 3 of Ninoy Aquino International Airport in Pasay City in January 2023. (File photo by KEVIN TRISTAN ESPIRITU / Agence France-Presse)

MANILA, Philippines — The Manila International Airport Authority (MIAA) will do electrical maintenance work at Ninoy Aquino International Airport (Naia) starting on Tuesday, Feb. 6, up to March 7.

The work will affect Naia Terminals 1 and 2, the International Cargo Terminal, the MIAA Administration Building, and the airfield.

The activities are part of the ongoing upgrades in Naia’s electrical systems.

READ: Speaker, OWWA execs inspect new OFW lounge at Naia Terminal 1

READ: Miaa: 279,953 flights logged at Naia in 2023

READ: Rep. Palma: Lounge for OFWs at NAIA a step to enhance their welfare 

“Minimal disruptions will occur in some areas but Management assures the riding public that critical systems used for passenger processing will remain operational,” MIAA said in a statement.

“The MIAA sees no significant impact of the scheduled works to flight operations,” it added.

The activities come after four power outages at the airport.

In one of the incidents, on Jan. 1, 2023, a power failure disrupted the country’s air navigation system and left thousands of travelers stranded in many airports.

Read more...