NPC execs allay fears of Angat Dam breakout | Inquirer News

NPC execs allay fears of Angat Dam breakout

/ 12:02 AM April 01, 2014

CITY OF SAN FERNANDO, Philippines—Officials of the National Power Corp. (NPC) have allayed fears of a breakout of Angat Dam in Bulacan province, saying the facility has no crack and is resistant to damage from earthquakes.

“The dam has no crack,” the NPC said in a statement on Friday.

It cited the status that engineer Manny Monteverde, a member of the agency’s dams, reservoirs and waterways division, shared with personnel of local disaster risk reduction and management councils, planning officers and social workers involved in an information campaign by the NPC.

Article continues after this advertisement

Monteverde also told them that rock-fill types of dams, such as Angat, have “inherent elasticity and self-healing characteristic.”

FEATURED STORIES

Engineer Russel Rigor of the NPC’s flood forecasting and warning system division said water was released from Angat Dam to avoid overflow, which might cause dam failure.

He said severe flooding in Calumpit, Paombong and Hagonoy towns could not entirely be blamed on the spilling of Angat Dam. These towns are part of the catch basin since these are located downstream of Pampanga River, which originates from Nueva Ecija province and drains out to Manila Bay, he said.

Article continues after this advertisement

Dr. Ramon Quebral, a geologist from Engineering and Development Corp. of the Philippines, said the impact of the West Valley Fault on Angat Dam must be verified further.

Article continues after this advertisement

Gladys Cruz-Sta. Rita, NPC president, urged the participants to advise the people “not to give in to fear and not to abandon caution.”

Article continues after this advertisement

The NPC, she said, supports the appeal of local officials to retrofit the dam.

The Angat hydroelectric power plant will be turned over to Korea Water Resources Corp. The strengthening of the dam, Sta. Rita said, is indicated in the terms of reference in the privatization agreement with the Power Sector Assets and Liabilities Management Corp.

Article continues after this advertisement

The NPC, she said, will continue to operate the dam and its spillways.

In December last year, some 12,000 students in Bulacan joined a drill using a scenario of a dam breakout. Tonette Orejas, Inquirer Central Luzon

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our daily newsletter

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

TAGS: Angat Dam, dam, Electricity, Energy, News, Regions

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our newsletter!

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

© Copyright 1997-2024 INQUIRER.net | All Rights Reserved

This is an information message

We use cookies to enhance your experience. By continuing, you agree to our use of cookies. Learn more here.