MRT-3 train offloads 180 passengers after electrical glitch

mrt 3

INQUIRER FILE PHOTO

The Metro Rail Transit-3 (MRT-3) offloaded almost 200 passengers on Sunday morning as one of its trains suffered an electrical glitch.

An MRT-3 report showed that the train offloaded its 180 commuters after it experienced an “electrical failure” around 9:15 a.m. at the northbound section of GMA-Kamuning Station.

The service disruption was caused by “worn out electrical sub-components,” the report said.

Affected passengers rode in a different train four minutes after. /je

Read more...