MRT, LRT operations unaffected by Metro quake drill

Operations of the Metro Rail Transit (MRT-3) and the Light Rail Transit Lines 1 and 2 will remain normal during the metro-wide earthquake drill this Thursday morning.

“Railway operations will not be affected by the Metro Manila Earthquake Drill,” the Department of Transportation and Communication (DOTC) said in a statement.

The Metro Manila Earthquake Drill will happen this Thursday starting 10:30 a.m. to 11:30 a.m.

READ: Metro-wide quake drill on July 30 eyes 12M participants

Motorists are expected to stop for 45 seconds once Metro Manila Development Authority (MMDA) traffic enforcers give the signal that the drill is in full swing.

Motorists plying along and below flyovers and in tunnels must keep driving to avoid being caught or trapped in these risk areas.

The metro-wide drill is part of the preparation of Metro Manila in the event a 7.2-magnitude quake hits the metropolis. IDL

READ: #INQuiz: Will you survive an earthquake? This may save your life

Read more...