Closed drainage blamed for flooding, dengue risk in Talisay | Inquirer News

Closed drainage blamed for flooding, dengue risk in Talisay

/ 06:45 AM August 07, 2013

With the drainage system blocked, residents of barangays Cansojong and Poblacion in Talisay City are complaining of stagnant, ankle-deep floodwater.

In barangay Cansojong, at least ten houses were flooded since the weekend.

Residents said it would take five to six days for the water to subside.

Article continues after this advertisement

Barangay Cansojong chairman Nick Hermosa said that the water comes from a water lagoon in barangay Poblacion located near Ngosiuk, a noodle factory.

FEATURED STORIES

He complained that the waterway has been closed by Cansojong resident Junjun Canton.

“He closed the waterway because the water from the noodle factory smells bad and is very turbid,” said Hermosa.)

Article continues after this advertisement

He said the water exits at a private beach resort owned by the Canton family.

Article continues after this advertisement

When Cebu Daily News visited the area, the house of Concepcion Warnac, 60, was still flooded.

Article continues after this advertisement

Warnac said the stagnant water has been there since May and has never subsided.

The floodwater also came from the canals that overflowed in the area.

Article continues after this advertisement

“If it rains, water from the canal overflows and pools here,” Warnac added.

Hermosa said the solution may be to divert the waterway to a vacant lot before it finally drains to the sea.

Dengue risk

“Magsige gud ko ug spray ug anti-dengue para way daghan lamok kay at risk kaayo ang health sa atong residents,” Hermosa added.

(I always spray insect repellants to ward off dengue mosquitoes. Many are at risk here because of this problem.)

Hermosa added that they have brought up the issue to the Mayor’s Office but no action has been made yet.

Alfredo Sipalay, Talisay City Legal Officer, have already conducted an ocular inspection at the area.

He said the Canton family is willing to open the drainage again, with the agreement that a water treatment system be placed.

He added that they would be calling the attention of the noodle factory’s owner.

However, Sipalay said that another option is to expropriate a portion of the land of the Canton residence.

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our daily newsletter

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

He said that if the plan will be implemented, it would address the problem of flooding in the two barangays. /Joy Cherry Quito, Reporter with reports from Gabriel Bonjoc

TAGS:

No tags found for this post.
Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our newsletter!

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

© Copyright 1997-2024 INQUIRER.net | All Rights Reserved

This is an information message

We use cookies to enhance your experience. By continuing, you agree to our use of cookies. Learn more here.