DPWH to implement Cebu’s 2017 flood control masterplan – Dizon

MANILA, Philippines — Department of Public Works and Highways (DPWH) Secretary Vince Dizon on Tuesday said his agency will now implement Cebu’s flood control master plan, which was completed in 2017.
Dizon shared the update during a meeting on the master plan.
He said he consulted Rogelio Singson, former DPWH chief from July 2010 to June 2016, whom he described as more knowledgeable about the master plans from previous administrations.
“Our commitment, as instructed by the President, is to consult Secretary Babes and those involved in the plan. There is no need to make new plans or studies because everything is already included in the master plan,” Dizon said in Filipino in an interview.
The master plan, which is based on a 2013 study by the Japan International Cooperation Agency, aims to provide a holistic approach to addressing flooding from upstream, not just downstream areas.
READ: Cebu needs master drainage plan badly after deadly Tino-triggered floods
Cebu Vice Governor Glenn Anthony Soco earlier called for the revival of the Metro Cebu Flood and Drainage System Master Plan amid flooding caused by Typhoon Tino.
Dizon said the DPWH will coordinate with the National Irrigation Administration, Department of Environment and Natural Resources, and other government agencies in implementing the master plan.
“No more meetings. As we said, it’s time for execution. The plan is already there, but this time, we will implement it the right way,” he said in Filipino.
He also said President Ferdinand Marcos Jr. instructed them to execute the plans nationwide.
Dizon will meet with the agency’s technical working group for the implementation of a nationwide flood control master plan.
Singson said the master plan is based on integrated water resources management.
READ: DPWH taps experts to ensure efficient plans for flood control projects
“Integrated water resources management is the right solution. Flood control is just a component. Other components include watershed protection, the water impounding, so you’re able to maximize the amount of surface water for potable water supply, for irrigation, hydro, and even tourism,” he added.
NIA Administrator Eduardo Guillen also welcomed the implementation of the master plan, which he said will benefit farmers the most. He noted that the flood control measures will include irrigation components.
“Now, you have to consider the upstream because that is where the water comes from. If it is properly impounded upstream, there will be no flood control problems downstream. Water is a resource,” Guillen said in a separate interview. /mcm