Manila Water gearing up for hot summer months 

Manila Water gearing up for hot summer months 

/ 08:22 PM March 17, 2024

The Cardona Treatment Plant, which draws water from the Laguna Lake is one of Manila Water’s supply augmentation facilities to ensure 24/7 water supply to its customers during the summer months.

The Cardona Treatment Plant, which draws water from the Laguna Lake is one of Manila Water’s supply augmentation facilities to ensure 24/7 water supply to its customers during the summer months.

MANILA, Philippines – Bracing for this year’s hotter summer months, Manila Water has been putting in place mitigating measures to ensure 24/7 water supply to its 7.6 million customers since early last year.

Augmentation sources and new water supply

The company has geared its new water sources and supply-augmentation facilities to ensure adequacy of supply and mitigate the effects of the El Nino phenomenon.

Article continues after this advertisement

Drawing water from Laguna Lake, the Cardona Treatment Plant can produce up to 110 million liters per day (MLD) and is already serving several towns in the province of Rizal.

FEATURED STORIES

Manila Water’s East Bay Phase 1 is already harvesting raw water from the lake and has a capacity to treat 50MLD.

At the Tayabasan River in Antipolo City, the Calawis Water Treatment Plant has been treating water from the river and can produce up to 80MLD.   

Article continues after this advertisement

Alternative water sources

The company also put in place alternative water sources. As the need arises, the Marikina Portable Treatment Plant, which draws water from the Marikina River, can produce up to 20MLD.

Article continues after this advertisement

Deep wells strategically located in Manila Water’s concession area could add up to 110MLD when needed.

Article continues after this advertisement

Recently, the company increased the efficiency of its backwash recovery systems in its East La Mesa Treatment Plant and Balara Treatment Plants from 30MLD to 40MLD.

A third backwash recovery system is under construction at its Cardona Treatment Plant.

Article continues after this advertisement

System checks and low NRW

Additionally, the East Zone concessionaire implements strict and regular system readiness checks, which include regular maintenance of facilities, water lines, and equipment, as well as line boosters and regulating valves.

This regular system monitoring of the water network helps the water company keep its non-revenue water (NRW) in check, or under 15%.

The World Bank standard for NRW is 25%. This puts Manila Water’s NRW at one of the lowest in Asia. NRW is water that is not billed and is lost due to leaks and illegal connections.

Intensified advocacy for the responsible use of water

In partnership with the Metropolitan Waterworks and Sewerage system, Department of Environment, Natural Resources and National Water Resources Board and other government agencies, Manila Water continues its relentless drive and call for the responsible and wise use of water especially as the levels of the dams continue to decline.

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our daily newsletter

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

While the current dam level is still above the operating level of 180 meters, Manila Water is urging the public to report leaks and practice water reuse and recycling.

TAGS: Manila Water, water

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our newsletter!

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

© Copyright 1997-2024 INQUIRER.net | All Rights Reserved

This is an information message

We use cookies to enhance your experience. By continuing, you agree to our use of cookies. Learn more here.