Water interruptions in parts of Las Piñas, Cavite extended until Nov. 2 | Inquirer News

Water interruptions in parts of Las Piñas, Cavite extended until Nov. 2

By: - Reporter / @zacariansINQ
/ 03:24 PM August 04, 2023

MANILA, Philippines — The Maynilad Water Services on Friday announced that parts of Las Piñas City, Bacoor, and Imus will continue to face daily water service interruptions until Nov. 2.

The same areas have been facing water interruptions since June 28, as Maynilad previously announced the replacement of three of 14 ultrafiltration (UF) membranes at the Putatan Water Treatment Plant 2 to maintain “optimum filtration capacity.”

ADVERTISEMENT

This time, based on Maynilad’s latest advisory, the water interruption — which was supposed to end on August 8 — was extended to November 2 to give way to the replacement of all remaining UF membranes at the Putatan Water Treatment Plant 2.

FEATURED STORIES

“[This is] in preparation for the Amihan Season when increases in the turbidity level of the raw water of Laguna Lake typically occur. The membranes are being replaced in batches to minimize the impact on customers of the resulting lower water production,” Maynilad explained.

“We have already completed the replacement of the initial batch of three UF membranes, so we will now proceed with the replacement of the remaining 11 units,” it added.

Maynilad, however, reminded affected residents that the daily interruption may also not happen as scheduled, meaning it may remain uninterrupted during some days within the period.

The water firm explained it depends on the actual volume of water our treatment plants can produce despite the ongoing UF replacement.

Maynilad urged affected customers to store enough water supply and reminded them to let their water run briefly until it clears upon the resumption of water services.

Below is the list of areas that will periodically lose water until November:

ADVERTISEMENT

Las Piñas City

5 p.m. to 6 p.m. daily from August 8 to November 2, 2023

  • Almanza Uno (Doña Josefa Village, Great Plains, and Lower Laong)
  • Pilar (Camella Homes Pilar, Gloria Compound, Pag-asa Compound, Maligaya Compound, and Pilar Village)
  • Talon Dos (BF Resort, Castilian Classics, Fronterra, Veraville Villa Grande Abel Nose, and Veraville Villa Gande Royale)
  • Talon Singko (Agro Homes 1 & 2, Christian Ville, Delnor Subdivision, Emaus, Doña Leoncia Homes, Golden Acres, Hamilton Heights, along Marcos Alvarez, Manuela Homes, Pamplona Metrocor, Pamplona Metrocor 1, Mike Sell, Moonwalk Village, Prutas Neighborhood, Rainbow Village, Royal South, Saint Scholastica, Samata Savior Ville, Soldier Hills 2, Teresa Park, Villa Pangarap, Veraville 3, Veraville Homes 3A, Veraville Fremont, Veraville Townhomes Classic, Veraville Townhomes 1, Villa Luningning, and WonderLand)

Bacoor City

5 p.m. to 6 p.m. daily from August 8 to November 2, 2023

  • Molino I (Marcos Alvarez Extension from Evergreen to St. Joseph Homes)
  • Molino Ill (Bagong Silang Blk 2, Bagong Silang P3, Bagong Silang Blk 3-2, Bagong Samahan ng Magkakapitbahay, Katherine Townhomes, Lynville-Annville Subdivision, Green Valley Subdivision, Magdiwang Subdivision, Melrose Park, Molino Park Homes, Molino Road Westside, Molino Heights Subdivision, Molino Road Westside (Avenida Rizal to Daanghari; Kanluran 2 Village), Progressive Village 12, 14 & 16, Queensrow (Bagong Silang Phase 1 & 2, Strikeville I, Town & Country Homes, Villa Cristorey Vizcarra Compound and Villa Maria)
  • Molino IV (Along Molino Road Westside (Phoenix to Paradiso)), Along Molino Road Eastside (from Daanghari to Dasmariñas Boundary, Duplex Subdivision, Elisa Homes Phase 2A, Georgetown Heights Phase 1 &2, Likha Village, Mary Homes, and Max Village)
  • Molino VI (BF Topman 2 and Soldier Hills Phase 1 to 4)
  • Molino VIl (Bagong Silang Interior, San Lorenzo Ruiz Subdivision,and St. Joseph Homes)
  • Queens Row Central
  • Queens Row East
  • Queens Row West (Sunvar Subdivision (Garden City II))
  • San Nicolas Ill (Bagong Kampi, Evergreen Street, Greenvalley Subdivision, Molino I (from Soldiers Hills Phase 1 Gate exiting Marcos Alvarez), NSGB, Poor’s Park, River Side, Samahang Magkakapit-bisig and Villa Mateo Subdivision)

Imus City

5 p.m. to 6 p.m. daily from August 8 to November 2, 2023

  • Pasong Buaya I (Vermosa Estates)
  • Pasong Buaya Il (Pasong Buaya Il Road and Vermosa Estates)

RELATED STORIES

Ambuklao, Binga dams to release water, threatening Benguet’s 3 barangays

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our daily newsletter

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

NCR water deficit looms in 2023 with growing population — MWSS RO

What the PH needs now to solve a water crisis

TAGS: Bacoor, Cavite, Imus, Las Piñas, water, water service

© Copyright 1997-2024 INQUIRER.net | All Rights Reserved

We use cookies to ensure you get the best experience on our website. By continuing, you are agreeing to our use of cookies. To find out more, please click this link.