MMDA: Several roads to undergo reblocking from April 14 to 18
MANILA, Philippines — Motorists are advised to take alternate routes as several roads in Metro Manila will undergo reblocking from April 14 to 18, the Metropolitan Manila Development Authority (MMDA) announced Wednesday.
The MMDA said the road reblocking and repairs, which will be led by the Department of Public Works and Highways (DPWH), will begin on April 14 at 1 a.m. The roads will be fully passable again by April 18, 4 a.m.
The reblocking and repair will cover the following roads:
1. EDSA-Makati City innermost lane (bus way) Guadalupe Cloverleaf going to Dr. Jose P. Rizal Avenue (near Guadalupe MRT Station);
2. Along C-5 Road, Makati City;
Article continues after this advertisement3. EDSA-Caloocan SB after Berlin St., (2nd lane from sidewalk), Caloocan City;
Article continues after this advertisement4. Along Cloverleaf (Chn 000- Chn 199) going to EDSA SB Quezon City, (Chn 000- Chn 173) going to A. Bonifacio SB Caloocan City;
5. Along C.P. Garcia Avenue before Katipunan Avenue (3rd lane from sidewalk);
6. Along EDSA SB Service Road corner 11th Jamboree to Timog Avenue intersection- Timog Avenue corner Kamuning Road, (1st and 2nd block from sidewalk), Quezon City;
7. Along EDSA SB bus/truck lane from Pasay/ Makati boundary to Malibay Bridge, Pasay City;
8. Along Pasig Blvd. SB, along Doña Julia Vargas Westbound, along C-5 Road SB, Pasig City;
9. Along EDSA SB Balintawak (pipe laying), Quezon City
READ:
Portion of Edsa to undergo repair, reblocking from Feb. 11 to 14